At Midstate Site Development, our crews are accustomed to fast-track schedule and time-sensitive projects. On large retail projects, once the developer gives the go-ahead the clock is ticking and all of the players are waiting on building pads. When the schedule is important, no company surpasses the capabilities and dedication of MSD. Our company is known for delivering projects on time and within the original budget.

Many MSD projects have received Excellence in Construction awards from the Associated Builders and Contractors (ABC) and some have received national acclaim.

Industrial Construction

Midstate Site Development continues to excel in the Industrial arena. MSD has implemented Safety and Project Support Programs to work in conjunction with your ongoing operations. Our fast tracked Site Work packages have been utilized for building new green field facilities and expansion projects throughout Connecticut and neighboring states. Some of our clients include:

  • NBC Channel 30 studios

  • ESPN’s main campus in Bristol, CT

  • Connecticut, Light and Power

  • Turbo Fuel Delivery Area Secondary Containment in CT

  • Photovoltaic Cell Installation in N.J

  • Pennsylvania, Power and Light

Whatever your project needs, be assured that our processes allow you to continue to operate smoothly - even during major renovations and excavations.

RESIDENTIAL & SUB-DIVISION CONSTRUCTION

Midstate Site Development provides the right combination of project management, manpower, and equipment resources for residential developments.

We work closely with developers and engineers to maximize the utilization of the available real estate.

MSD’s pipe crews are dedicated to their tasks while working in coordination with grading crews. Our pipe crews install storm, sanitary, and domestic water piping systems.

MSD project management works closely with the onsite superintendent to insure that daily productions are met.

The project manager is available at all times to meet with the site engineer and developer to discuss the common goal of getting lots on the ground.

HEAVY & HIGHWAY CONSTRUCTION

MSD has the required experience and expertise to work on specialized expansion projects such as town roads and state highways.

These projects are usually time sensitive and all other trades are lined up behind the site contractor.

MSD takes the lead role very seriously and coordinates well with the state or municipality’s representative and all the associated subcontractors.

We have been involved with the construction of new town roads and many widening and intersection improvements for the state of Connecticut DOT.

ATHLETIC FIELD CONSTRUCTION

Midstate Site Development has the experience and expertise to furnish you with a complete running track facility from the beginning Phase of design to the final phase of natural or synthetic turf surface installation and professional striping. Your completed facility will have top quality appearance worthy of both school and community pride.

Phase 1: Site work will begin by site clearing and compaction of the cuts and fills. For all types of natural and synthetic turf fields, Midstate can furnish the recommended drainage for the infrastructure, and our utilization of GPS technology can fine grade projects to the highest tolerances.

Phase 2: The installation of a continuous interior collection channel provides all important drainage for running track and field, laser controlled dimension and elevation control, and serves as an interior curb.

Phase 3: Curbing provides a buffer between the running track and the surrounding area. It may be used on the outside perimeter of the track, the D-zone, or to edge asphalt event areas.

Phase 4: The track oval normally consists of an aggregate base course and hot mix asphalt. This will insure proper surface tolerance, slope, and grade.

Phase 5: MSD will take care of locating the event areas. These events include shot and discus throwing, long jump and pole vault, high jump and steeplechase.

Phase 6: Equipment such as pole vault boxes, take-off boards, discus cages and removable curbs can be installed at the time of construction.

Phase 7: A full line of latex and polyurethane-bound running track surfaces is available in a variety of colors and can be customized according to budget and athletic performance requirements.

Phase 8: A CAD system diagram of all markings is produced from computer generated calculations. The markings and stripes are then expertly applied to conform to the requirements of the appropriate governing body.

SEWER, WATER & UTILITY CONSTRUCTION

Midstate Site Development has extensive experience successfully overcoming logistic and scheduling challenges required of complex underground utility projects.

Our project teams have installed underground utilities on a wide variety of projects requiring high levels of security and expertise.

Some of our projects include:

  • ESPN Studios

  • NBC30 Studios

  • Various street improvements throughout Connecticut

  • CT Department Of Correction facilities

  • Commercial building sites

  • Aviation projects

In addition to storm drain, sewer and water lines, our teams have installed miles of duct bank. From HDPE , PVC, concrete, and large diameter ductile iron we have installed it all. Our constant commitment to safety sets us above the rest.

MSD is a licensed Surface Sewage Installer .